Footers, slabs, sidewalks, steps and driveways poured by the same crew that lays the block on top of them.
★★★★★5.0 Rated on GoogleConcrete and masonry meet at the footer. Every block foundation, retaining wall and set of steps we build starts with one, and a footer that is out of level or too shallow shows up later as a crack in the wall above it. So we pour our own.
The same crew pours flatwork: garage and barn floors, sidewalks, patios, steps and driveways. The work that decides how long concrete lasts happens before the truck shows up. The base gets compacted, the forms get set so water drains away from the building, and reinforcement goes where the load will be.
We also put up clear span and hoop buildings for farms and industrial sites, from the foundation to the finished structure, with one crew.
We do this work in Wooster, Orrville, Dalton and Massillon, and across the rest of our service area. Cougar Masonry is a licensed and insured masonry contractor based in Orrville.
Garage floors, basement floors, shop and barn floors and equipment pads. We prep and compact the base, set forms and reinforcement, pour, finish and cut control joints so the slab cracks where it should.
Concrete Slabs and FloorsNew and replacement concrete sidewalks, patios and landings. We tear out the old concrete, fix the base, form and pour with the right slope for drainage, and finish with a broom texture for footing.
Concrete Sidewalks and PatiosPoured concrete steps and stoops, built new or replacing ones that have settled or crumbled. Formed with a comfortable rise and run, set on a footer and finished to match the walk and porch.
Concrete StepsConcrete driveways and aprons poured on a compacted stone base with reinforcement and control joints. We remove the old drive, correct the grade so water runs away from the garage and finish it to last.
Concrete DrivewaysFoundations and full erection of clear span and hoop buildings for farms, plants and material yards. We build the block or concrete foundation, set the posts and put the building up with one crew.
Clear Span and Hoop BuildingsConcrete poured on a soft base or onto frozen ground will crack no matter who pours it. If the ground or the forecast is wrong, we will say so and move the date instead of pouring a slab you will end up replacing.
Four inches is the usual minimum for cars and light trucks, poured on a compacted stone base. Driveways that see heavier trucks or equipment are poured thicker with more reinforcement. We size it to what will drive on it.
You can usually walk on it in a day or two and drive a car on it after about a week. Concrete keeps gaining strength for about a month, so heavy loads should wait.
All concrete cracks a little as it cures and moves with the seasons. Control joints are cut so it cracks in straight lines where you will not notice. A good base and the right thickness keep those cracks tight.
Get your free, no obligation estimate today.
